Sailing Blue Pearlvideo

Ep 69 | Life on the hard

10 March 2024 · 22 min · 3K views · Puerto Rico

What this video covers

The crew of the Blue Pearl performs extensive refit work while hauled out in a boatyard, focusing on electrical upgrades and through-hull valve maintenance. Chris and Jessica Hanna install an 800-amp-hour lithium battery bank, replacing old wiring with 4/0 cable to prevent voltage drop to the windlass.5:23 They also rebuild a 1982 Maxwell Nilsson windlass motor, which had previously failed due to a lack of available parts.7:59 During a routine inspection of 11 through-hull fittings, the crew discovers several valves seized in place or improperly installed with excessive 3M 5200 adhesive.17:26 Using heat and a custom-fabricated tool, they remove five problematic through-hull fittings for replacement.14:35 The project also includes troubleshooting an AC unit and a dishwasher, the latter of which was damaged by shore power at San Felipe Marina.9:58 The crew sources parts from Home Depot, West Marine, and online retailers while managing the logistical challenges of obtaining marine-specific supplies in the United States.2:53

Watch on YouTube

More from Sailing Blue Pearl

Our Precious Daisy Mae💔Jun 2026Ep 100 | The Grand FinaleJun 2025Ep 99 | A great adventure!May 2025Ep 98 | Our big newsMay 2025

From Sailing Blue Pearl — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue