DAY 1 OF THE REFIT IN GREECE ⏳ WILL WE MAKE IT IN 3 MONTHS? | Windy Wayra Ep 70
10 de mayo de 2026 · 9 min · 2K visitas · Greece
Qué cubre este vídeo
Daniela and Alex begin a three-month refit of their Amel Maramu 46 in Greece, focusing on interior restoration and electrical system upgrades. Daniela removes old adhesive residue, interior foam, and outdated curtain tracks from the cabin ceilings and walls, preparing surfaces for refinishing.0:17 She uses a flat-head screwdriver and a protective wedge to pry hardware from the wood without damaging the underlying fiberglass.6:26 The crew identifies a leak that has discolored the cabin table, necessitating future sanding and polishing.0:58
Alex upgrades the solar charging system to support additional panels by installing three new MPPT controllers: one 60-amp unit and two 40-amp units.7:24 He mounts these in a location that allows for through-bolted connections.3:45 Additionally, the crew removes the existing propeller to facilitate a future transmission seal replacement, citing recurring noise and maintenance issues with previous propellers.1:24 They plan to install a new FlexoFold folding propeller.1:34 The project involves extensive cable routing to connect the new solar array to the stern arch.9:05
Más de Windy_Wayra
De Windy_Wayra — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.