Windy_Wayravídeo

OUR SHIP IN 3D: REPLACING THE RIGGING OURSELVES⚓💻 | Windy Wayra Ep 68

30 de enero de 2026 · 10 min · 2K visitas

Qué cubre este vídeo

The owners of an Amel Maramu 46 are preparing to replace their standing rigging by using 3D modeling software to plan structural modifications and ordering custom-terminated wire from SVB.6:24 The current rigging dates to 2006, exceeding the recommended 15-year service life, though a recent inspection of the terminals showed no signs of corrosion.4:17 To minimize costs and ensure accuracy, the crew ordered 1x19 stainless steel wire with one end factory-swaged and the other left for field-installation using mechanical terminals.6:11 This method allows them to measure the old cables against the new ones individually, reducing the risk of measurement errors.7:03 To maintain mast stability during the replacement process, they plan to use a spinnaker halyard tensioned by a winch to temporarily replace the load of each stay.8:08 The project also includes designing custom davits and integrating a Hydrovane windvane steering system.2:32 A professional inspection will follow the installation to satisfy insurance requirements for mast-breakage coverage.5:11

Ver en YouTube

Más de Windy_Wayra

Welding, angle grinders, and lots of sweat: This is how we made our SOLAR ARCH in Greece | Windy W...jun 2026DAY 1 OF THE REFIT IN GREECE ⏳ WILL WE MAKE IT IN 3 MONTHS? | Windy Wayra Ep 70may 2026OUR WAYRA WISHLIST: MADNESS OR NECESSITY? | Windy Wayra Ep 70abr 2026WE VISIT WAYRA, AN INTERNAL DISASTER... ☞ | Windy Wayra Ep 69mar 2026

De Windy_Wayra — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema