Sailing Squibvídeo

Squib's Refit - new cockpit drain - closing galley openings and sanding walls /71

13 de junio de 2024 · 19 min · 803 visitas

Qué cubre este vídeo

Refitting the cockpit and galley of the catamaran *Squib* involves installing new cockpit drains, repairing delaminated interior panels, and refurbishing original cabin lighting. To improve cockpit drainage, the owner cuts new holes in the cockpit floor to relocate the drains to the corners, laminating wooden backing plates underneath with thickened epoxy to ensure the through-hull fittings sit flush.0:49 A flexible hose connects the new drain to the hull, though the owner notes the current hose material kinks easily and plans to source a more rigid, non-kinking alternative.18:15 Interior work includes cutting out delaminated sections of bathroom paneling, cleaning the substrate, and re-laminating the area with epoxy.6:26 The galley renovation involves sanding walls and preparing templates to seal unused holes in the cabinetry.4:12 The owner also cleans out storage compartments, salvaging electrical wiring and spare parts while discarding debris.13:07 The project concludes with plans to strip and polish the boat's original wood-and-brass cabin lamps to contrast with the newly painted interior surfaces.19:18

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sept 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema