Sailing Squibvídeo

Squib's Refit - new cockpit drain - closing galley openings and sanding walls /71

13 de junho de 2024 · 19 min · 803 visualizações

O que este vídeo aborda

Refitting the cockpit and galley of the catamaran *Squib* involves installing new cockpit drains, repairing delaminated interior panels, and refurbishing original cabin lighting. To improve cockpit drainage, the owner cuts new holes in the cockpit floor to relocate the drains to the corners, laminating wooden backing plates underneath with thickened epoxy to ensure the through-hull fittings sit flush.0:49 A flexible hose connects the new drain to the hull, though the owner notes the current hose material kinks easily and plans to source a more rigid, non-kinking alternative.18:15 Interior work includes cutting out delaminated sections of bathroom paneling, cleaning the substrate, and re-laminating the area with epoxy.6:26 The galley renovation involves sanding walls and preparing templates to seal unused holes in the cabinetry.4:12 The owner also cleans out storage compartments, salvaging electrical wiring and spare parts while discarding debris.13:07 The project concludes with plans to strip and polish the boat's original wood-and-brass cabin lamps to contrast with the newly painted interior surfaces.19:18

Ver no YouTube

Mais de Sailing Squib

Sailing Squib - May 2026/309/2026Sailing Squib May 2026 /208/2026Sailing Squib - Contemporary Witness07/2026Sailing Squib - May 2026 /107/2026

De Sailing Squib — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema