Sailing Yabávídeo

Overwhelming amount of PROGRESS! — Sailing Yabá #14

7 de febrero de 2021 · 26 min · 128K visitas

Qué cubre este vídeo

Refurbishing a large wooden schooner requires structural repairs to the stern and the installation of a new keel. To access the rotten stern timbers, the crew removes the swimming platform and the rudder.0:47 They replace six large, eight-centimeter-thick planks at the stern to restore structural integrity.1:59 For the new keel, the team joins multiple sections using Inox threaded rods, wrapping the bolts in cotton soaked in sealant to prevent water ingress and corrosion.12:50 To create a precise hole for the propeller shaft through the new wood, they use a custom-made guide rod and a manual boring tool with an adjustable blade, turning it by hand to enlarge the aperture.16:39 The crew aligns the keel under the hull using a string-line method, adjusting its position millimeter by millimeter with wooden wedges and jacks before bolting it to the floor timbers.23:58 The project progresses with the assistance of local shipyard workers, Elio and Beto, who complete the keel assembly and alignment in one week.13:33

Ver en YouTube

Más de Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáoct 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáoct 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásept 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásept 2026

De Sailing Yabá — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema