Más
Idioma
Modo de visualización
Leading the Escapadevídeo
25 de febrero de 2026 · 22 min · 26K visitas · Florida
Qué cubre este vídeo
The crew of Escapade, a liveaboard sailboat in West Palm Beach, Florida, tears out the portside saloon cabinetry and begins a full rebuild after a leaking freezer rotted the nav table area's structural wood.▶ 1:15 During demolition they also find a mushroom growing under the floor — confirming the rot had spread further than expected.▶ 5:19 The nav table, which the crew never used, is removed entirely; the replacement design adds open shelves, a drawer system, and a lowered fridge enclosure that levels with the surrounding furniture, freeing the former nav seat for camera and editing gear storage.▶ 2:59 Templates for the new cabinet panels are cut from builder's paper aboard, then taken to World Panel Products in Riviera Beach, Florida, where staff member Chase helps select a half-inch teak veneer marine plywood (BS1088-grade Okume core) and provides workshop access with a circular saw and track system — a significant advantage over cutting with a jigsaw on the boat.▶ 14:18 Panels are laid out on a single sheet to match grain direction, cut, dry-fitted aboard, and confirmed near-perfect on the first test.▶ 17:54 Floor replacement and cushion fabrication are deferred to the next episode.▶ 21:05 Templating cabinet panels before cutting floor templates prevents mismatched dimensions when both surfaces change simultaneously.
Más de Leading the Escapade
De Leading the Escapade — mira el barco del canal, la tripulación y cada vídeo analizado.