sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão
sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026

InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão

Leading the Escapade · vídeo

We Opened a Can of Worms on Our Sailboat - DIY Saloon Rebuild! Ep-206

25 de fevereiro de 2026 · 22 min · 26K visualizações · Florida

Ver no YouTube

O que este vídeo aborda

The crew of Escapade, a liveaboard sailboat in West Palm Beach, Florida, tears out the portside saloon cabinetry and begins a full rebuild after a leaking freezer rotted the nav table area's structural wood.▶ 1:15 During demolition they also find a mushroom growing under the floor — confirming the rot had spread further than expected.▶ 5:19 The nav table, which the crew never used, is removed entirely; the replacement design adds open shelves, a drawer system, and a lowered fridge enclosure that levels with the surrounding furniture, freeing the former nav seat for camera and editing gear storage.▶ 2:59 Templates for the new cabinet panels are cut from builder's paper aboard, then taken to World Panel Products in Riviera Beach, Florida, where staff member Chase helps select a half-inch teak veneer marine plywood (BS1088-grade Okume core) and provides workshop access with a circular saw and track system — a significant advantage over cutting with a jigsaw on the boat.▶ 14:18 Panels are laid out on a single sheet to match grain direction, cut, dry-fitted aboard, and confirmed near-perfect on the first test.▶ 17:54 Floor replacement and cushion fabrication are deferred to the next episode.▶ 21:05 Templating cabinet panels before cutting floor templates prevents mismatched dimensions when both surfaces change simultaneously.

Mais de Leading the Escapade

Ignoring This Boat Upgrade Could Cost You Everything | TruDesign Install! Ep-22907/2026The Haul Out That Changed Everything...Ep 228!06/2026🌴 The Last Paradise Before the Pacific Crossing | San Blas Islands! Ep-22706/2026LAND at Last - Arriving in COLOMBIA After a WILD Passage | Day 15 (Ep 226)05/2026

De Leading the Escapade — veja o barco, a tripulação e todos os vídeos analisados do canal.

Reportar um problema
InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026