Piratas Aderivavídeo
Day 32: I'm tired of hiding this. Today I'm showing it without filters 🚨
1 de julio de 2025 · 24 min · 910 visitas · Porto Santo
Qué cubre este vídeo
Jorman, the owner of a sailboat project in Puerto Santo, continues the restoration of his vessel despite persistent rain and high winds.▶ 0:04 The project, documented in real-time, faces significant delays due to adverse weather conditions that prevent outdoor work and risk damaging tools and materials.▶ 2:36 Jorman focuses on interior tasks, specifically removing an obsolete gas line from the anchor locker and installing new polycarbonate windows in the forward cabin.▶ 7:27
To address chronic leaks, Jorman replaces the original 1980s window installation method, which utilized 72 screws per window, with a modern approach combining 3M adhesive tape and polyurethane sealant.▶ 13:05 He plans to reduce the number of fasteners to 12 strategic screws per window to minimize potential leak points caused by material expansion and contraction.▶ 15:08 With assistance from Yendi, Jorman presents the new polycarbonate sheets to mark and drill holes accurately.▶ 20:51 The project relies on community feedback for technical advice on fiberglass, plumbing, and electrical work to overcome restoration challenges.▶ 23:08
Más de Piratas Aderiva
De Piratas Aderiva — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



