Sail Lifevídeo

⛵️Insulating our shipping container workshop. Ep 648

28 de septiembre de 2025 · 24 min · 85K visitas

Qué cubre este vídeo

Mads frames and insulates a 40-foot shipping container workshop to support the refit of a 44-foot catamaran, Spiffy.0:26 To maximize floor space for 4x8-foot sheet processing, he designs a ceiling-mounted hoisting system for a 4x4-foot CNC machine.0:35 He reinforces the container’s ceiling joists with double top plates, additional studs, and blocking to support a 400-pound load.1:48 He installs Unistrut tracks to serve as the hoist rail and repurposes a damaged winch salvaged from the catamaran, though he currently lacks a replacement part for the unit's bent stripper arm.0:13 He applies two-part spray foam insulation to the container walls, opting for a thicker application than planned to ensure a minimum one-inch thickness and prevent condensation.15:53 He notes that while two kits covered 16 feet of the container, three additional kits are required to complete the insulation.10:03 Future tasks include installing a mini-split air conditioner and finishing the interior office walls.22:36

Ver en YouTube

Barcos en este vídeo

Antares Yachts 44Su barco

Más de Sail Life

The road back to boat work: moving into the workshop & our conex moving choices. Ep. 690ago 2026The road back to boat work: The bunker, hidden bookcase door & bad news. Ep. 689ago 2026The road back to boat work: Trash pit and new a $%*& gorgeous DIY dining room table Ep. 688jul 2026The road back to boat work: Floors, paint, and tool trailer Ep. 687jul 2026

De Sail Life — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema