Sail Lifevídeo

The road back to boat work: Bunker Makeover! Ep. 696

20 de septiembre de 2026 · 21 min · 80K visitas

Qué cubre este vídeo

Mads converts a concrete hurricane shelter into a climate-controlled technical workspace for the Sail Life Global headquarters.0:45 He clears the structure of existing bunks, a water tank, and a water heater to create an open interior.2:06 To address moisture issues, he plans to seal the exterior walls and roof with liquid rubber and install an interior airlock with an insulated door.2:20 He frames the interior walls with a two-inch gap for spray foam insulation and rockwool, targeting an R-value of 28 to 29.10:06 During the process, he relocates an existing mini-split unit and discovers an improperly wired subpanel that remains energized despite the main breaker being switched off.15:09 Separately, he prepares a shipping container workshop for relocation by securing the CNC machine and its components to the floor.5:52 He plans to hire a new transportation company for the move after experiencing delays with his initial contractor.17:41

Ver en YouTube

Barcos en este vídeo

Antares Yachts 44Su barco

Más de Sail Life

The road back to boat work: The square eagle has landed! Ep. 695sept 2026The road back to boat work: We're gravel rich & ready for shipping containers! Ep. 694sept 2026Can I build an aluminum fuel tank with the xTool MetalFab laser welder and CNC? Ep. 693ago 2026The road back to boat work: shipping delays, site prep and bending metal with a 3D print Ep. 692ago 2026

De Sail Life — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema