Sailing Squibvídeo
Squib's Refit - Ceiling storage in the cockpit - Installing the pantry refrigerator - Laying cables /109
6 de marzo de 2025 · 19 min · 928 visitas
Qué cubre este vídeo
The crew of the sailboat Squib installs overhead storage and relocates the galley refrigerator to optimize interior space. To store dinghy oars and a boat hook, the owner constructs a custom 1.40-meter plywood box designed to mount to the cabin ceiling.0:18 After measuring the oars, he extends the box length by 20 centimeters to ensure a proper fit and secures the assembly with epoxy and screws.2:47 The project includes adding small overhead compartments near the galley for spice and kitchen storage.1:03
Simultaneously, the crew routes new electrical wiring for the refrigerator through existing conduits and a newly drilled bulkhead hole.8:29 They seal the bulkhead penetration with a section of pipe to ensure water tightness.11:44 After clearing the old refrigerator, they position the unit in its permanent location and crimp new connectors onto the power cables, finishing the connections with heat-shrink tubing.16:42 The refit increases the usable galley workspace and provides dedicated stowage for previously loose deck equipment.
Más de Sailing Squib
De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



