Sailing Into the Mysticvídeo

S4, Ep39 Sailing Couple Solar Arch Build — Mooring Ball Projects & Hard Lessons Learned

3 de octubre de 2025 · 20 min · 357 visitas · San Diego, United States

Qué cubre este vídeo

Tim, the host of the *Mystic*, fabricates and installs a custom solar arch and rack to support two 400-watt bifacial solar panels.18:13 He constructs the rack from steel tubing, modifying the design to accommodate the panels' dimensions and the boat's stern configuration.19:01 To facilitate welding the rack to the existing arch, the crew moves the *Mystic* from a mooring ball to a guest dock at Shelter Island.5:21 During the departure from the mooring, the stern line fouls the propeller, requiring an underwater effort to clear the line before the boat can proceed.14:19 The project also includes installing marine-grade starboard seats at the stern to replace unsecured deck chairs.0:20 The crew manages logistics by using two vehicles to transport welding equipment, the solar rack, and the panels between the boat launch and the guest docks.10:42 After successfully welding the rack and mounting the panels, the crew completes the installation and prepares to return the vessel to its mooring.16:29

Ver en YouTube

Más de Sailing Into the Mystic

Disaster in La Paz: Where is our Dinghy? [Ep 65]ago 2026Beauty Don't Stop Us, We Gotta Get to La Paz Ep64ago 2026Rip to the Tip - Sailing the Last Leg to Cabo [Ep 63]ago 2026Are we Sailing...or Motoring?? [Ep 62]jul 2026

De Sailing Into the Mystic — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema