Sailing Into the Mysticvideo

S4, Ep39 Sailing Couple Solar Arch Build — Mooring Ball Projects & Hard Lessons Learned

October 3, 2025 · 20 min · 369 views · San Diego, United States

What this video covers

Tim, the host of the *Mystic*, fabricates and installs a custom solar arch and rack to support two 400-watt bifacial solar panels.18:13 He constructs the rack from steel tubing, modifying the design to accommodate the panels' dimensions and the boat's stern configuration.19:01 To facilitate welding the rack to the existing arch, the crew moves the *Mystic* from a mooring ball to a guest dock at Shelter Island.5:21 During the departure from the mooring, the stern line fouls the propeller, requiring an underwater effort to clear the line before the boat can proceed.14:19 The project also includes installing marine-grade starboard seats at the stern to replace unsecured deck chairs.0:20 The crew manages logistics by using two vehicles to transport welding equipment, the solar rack, and the panels between the boat launch and the guest docks.10:42 After successfully welding the rack and mounting the panels, the crew completes the installation and prepares to return the vessel to its mooring.16:29

Watch on YouTube

More from Sailing Into the Mystic

We Find a Hand Built Steel Expedition Sailboat: Interview + Boat Tour [Ep 70]Oct 2026San Diego to Cabo by Sailboat: Every Dollar We SpentOct 2026Why We Ran North Before Hurricane Season Turned Scary [Ep 69]Sep 2026Tim's Favorite Anchorage in All of Baja | Agua Verde [Ep68]Sep 2026

From Sailing Into the Mystic — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue