MotionMevídeo

Building our home | PROBLEMS at the start of construction! | 2

13 de agosto de 2023 · 11 min · 11K visitas

Qué cubre este vídeo

Marina and Michel begin construction on the Caillet Studio in a remote area lacking municipal water and electricity. To level the uneven terrain, they use a 25-meter hose filled with water as a makeshift level.1:16 Delivery trucks frequently bog down in the soft, sandy soil at the site entrance, requiring the couple to reinforce the access path with gravel.1:23 Early in the project, a boundary dispute arises when neighbors mistakenly claim the land, but the issue is resolved after verifying property documentation at the local registry office.2:47 A hired crew led by Flavinaldo excavates foundations, including footings reaching 1.60 meters in depth, and begins installing steel reinforcement bars.7:38 The couple constructs a temporary gazebo to serve as a tool shed and solar lounge.1:56 Following the foundation work, they begin laying expanded polystyrene blocks to form the studio's floor base.10:45

Ver en YouTube

Más de MotionMe

What do you need to KNOW to build a CNC at home?oct 2026What do you need to build a DIY CNC at home?sept 2026Testing the DIY CNC I Built from SCRATCHsept 2026How I Built My CNC Machine? | Design and Assemblyago 2026

De MotionMe — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema