MotionMevídeo
Building our home | PROBLEMS at the start of construction! | 2
13 de agosto de 2023 · 11 min · 11K visitas
Qué cubre este vídeo
Marina and Michel begin construction on the Caillet Studio in a remote area lacking municipal water and electricity. To level the uneven terrain, they use a 25-meter hose filled with water as a makeshift level.1:16 Delivery trucks frequently bog down in the soft, sandy soil at the site entrance, requiring the couple to reinforce the access path with gravel.1:23 Early in the project, a boundary dispute arises when neighbors mistakenly claim the land, but the issue is resolved after verifying property documentation at the local registry office.2:47 A hired crew led by Flavinaldo excavates foundations, including footings reaching 1.60 meters in depth, and begins installing steel reinforcement bars.7:38 The couple constructs a temporary gazebo to serve as a tool shed and solar lounge.1:56 Following the foundation work, they begin laying expanded polystyrene blocks to form the studio's floor base.10:45
Más de MotionMe
De MotionMe — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



