MotionMevideo

Building our home | PROBLEMS at the start of construction! | 2

13 de agosto de 2023 · 11 min · 11K vistas

¿Qué cubre este video?

Marina and Michel begin construction on the Caillet Studio in a remote area lacking municipal water and electricity. To level the uneven terrain, they use a 25-meter hose filled with water as a makeshift level.1:16 Delivery trucks frequently bog down in the soft, sandy soil at the site entrance, requiring the couple to reinforce the access path with gravel.1:23 Early in the project, a boundary dispute arises when neighbors mistakenly claim the land, but the issue is resolved after verifying property documentation at the local registry office.2:47 A hired crew led by Flavinaldo excavates foundations, including footings reaching 1.60 meters in depth, and begins installing steel reinforcement bars.7:38 The couple constructs a temporary gazebo to serve as a tool shed and solar lounge.1:56 Following the foundation work, they begin laying expanded polystyrene blocks to form the studio's floor base.10:45

Ver en YouTube

Más de MotionMe

What do you need to KNOW to build a CNC at home?oct 2026What do you need to build a DIY CNC at home?sep 2026Testing the DIY CNC I Built from SCRATCHsep 2026How I Built My CNC Machine? | Design and Assemblyago 2026

De MotionMe — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema