Sailing Jibseavídeo

Discovering a problem that could sink our sailing plans. Ep 246

10 de agosto de 2025 · 27 min · 38K visitas · Newfoundland & Labrador

Qué cubre este vídeo

The crew of Jibsea hauled their vessel out of the water in Newfoundland to investigate a persistent vibration in the propulsion system.4:28 After installing a flexible coupling failed to resolve the issue, they removed the propeller and shaft, discovering significant wear on both the cutlass bearing and the prop shaft itself.14:00 Because the shaft could not be removed through the rudder due to the skeg, the crew had to shift the engine forward to gain clearance.11:50 A local resident provided a spare shaft of the correct diameter, which the crew took to a machine shop to be cut and machined to size.15:11 While waiting for parts, the crew explored the local waters of Chimney Cove and participated in recreational cod fishing with local patrons.17:55 The repair process highlights the necessity of checking shaft alignment and cutlass bearing wear when troubleshooting drivetrain vibrations.

Ver en YouTube

Más de Sailing Jibsea

Reality of YouTubing + Sailing + Adventuring | Behind the Scenes - Ep 287sept 2026Our Backyard Is Norway’s Most Iconic Fjord - Ep 286sept 2026The Unpredictable Dangers of Sailing Norway's Fjords - Ep 285sept 2026HOVERAir X1 PROMAX: 3 Month Honest Drone Reviewago 2026

De Sailing Jibsea — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema