Sailing Florencevídeo
REPAIR pit-stop MID-OCEAN | Sailing Florence Ep.161
4 de agosto de 2023 · 24 min · 93K visitas
Qué cubre este vídeo
After a 1,013-mile passage from the Bahamas, the 46,000-mile circumnavigating vessel Florence arrived in Bermuda to conduct essential repairs before the next 2,000-mile leg to the Azores.1:13 The crew encountered 20- to 30-knot headwinds during the nine-day transit, forcing a zigzag route that exceeded the direct distance by over 200 miles.5:19 Upon arrival in St George's Harbour, the crew performed a full rig inspection and replaced a worn aluminum boom toggle with an upgraded stainless steel version to prevent potential mast failure.11:42 Additional maintenance included hand-stitching the genoa's UV cover, modifying genoa sheet anti-chafe protection, and replacing the compressed seal on the lazarette hatch to prevent water ingress during heavy weather.13:59 The crew utilized a local contact to receive shipped parts, highlighting the logistical challenges of sourcing marine components while cruising.12:27 While exploring the island, the crew visited the historic Dockyard and Somerset Bridge before preparing for the final North Atlantic crossing.17:22 Thorough rig inspections and proactive maintenance are critical for safety when operating beyond the range of rescue.
Barcos en este vídeo
Más de Sailing Florence
De Sailing Florence — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



