Sailing Squibvídeo

Squib's Refit - Windvane Console 2 - Keder Rails - Installing Cam Cleats - Installing Covers /95

28 de noviembre de 2024 · 17 min · 816 visitas

Qué cubre este vídeo

Refit work on the 38-ft sailboat Squib includes installing a Windpilot self-steering system, mounting Spinlock rope clutches, and finishing deck hardware. The crew mounts the Windpilot main bracket on the stern, ensuring the rudder clears the swim ladder, and plans to finalize the installation after sourcing correct-length bolts.0:29 To accommodate new deck turning blocks, a wooden block requires planing to reduce its thickness, allowing for 70 mm bolts instead of 80 mm.3:02 The project also involves installing two sections of Keder rail for cockpit enclosure mounting and securing access covers on the equipment arch, which required grinding the edges for a flush fit.5:18 Finally, the crew installs Spinlock rope clutches on both sides of the cockpit to replace manual line handling, using thickened epoxy to level the mounting surface where holes exited near reinforcement edges.11:23 The crew fills remaining pinholes in the fiberglass with epoxy and polishes the bow pulpit before final assembly.15:49

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sept 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema