Sailing Squibvidéo

Squib's Refit - Windvane Console 2 - Keder Rails - Installing Cam Cleats - Installing Covers /95

28 novembre 2024 · 17 min · 816 vues

Ce que couvre cette vidéo

Refit work on the 38-ft sailboat Squib includes installing a Windpilot self-steering system, mounting Spinlock rope clutches, and finishing deck hardware. The crew mounts the Windpilot main bracket on the stern, ensuring the rudder clears the swim ladder, and plans to finalize the installation after sourcing correct-length bolts.0:29 To accommodate new deck turning blocks, a wooden block requires planing to reduce its thickness, allowing for 70 mm bolts instead of 80 mm.3:02 The project also involves installing two sections of Keder rail for cockpit enclosure mounting and securing access covers on the equipment arch, which required grinding the edges for a flush fit.5:18 Finally, the crew installs Spinlock rope clutches on both sides of the cockpit to replace manual line handling, using thickened epoxy to level the mounting surface where holes exited near reinforcement edges.11:23 The crew fills remaining pinholes in the fiberglass with epoxy and polishes the bow pulpit before final assembly.15:49

Regarder sur YouTube

Plus de vidéos de Sailing Squib

Sailing Squib - May 2026/3sept. 2026Sailing Squib May 2026 /2août 2026Sailing Squib - Contemporary Witnessjuil. 2026Sailing Squib - May 2026 /1juil. 2026

De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème