Sailing Supernovavídeo

BOAT JOBS GONE WRONG... [Ep. 26]

26 de enero de 2024 · 40 min · 15K visitas

Qué cubre este vídeo

The crew of Supernova performs several maintenance tasks while anchored, including re-rigging the in-mast furling mainsail, installing an anchor bridle, and attempting to replace a throttle cable. To address a binding mainsail car, they re-rig the outhaul using a new knot and add grease to the track, though the car continues to jump.3:15 They install an anchor bridle using an old shackle to relieve tension on the windlass and reduce noise in rolly anchorages.6:19 A two-day effort to replace a faulty throttle cable with a universal Amazon-sourced spare fails because the cable is too long and creates too much friction when looped; the crew decides to order a high-quality, correctly sized replacement.36:00 Additionally, they install a new hose clamp on the washing machine drain line to prevent potential saltwater backflow.25:34 Despite these persistent mechanical challenges, the crew balances the work with beach walks and swimming.38:23 Using high-quality, correctly sized control cables is essential, as cheap, oversized universal replacements create excessive friction that prevents proper shifting.36:35

Ver en YouTube

Más de Sailing Supernova

It was 100% my fault [Ep. 167]oct 2026So much pain! [Ep. 166]oct 2026How solo sailors die [Ep. 165]sept 2026Hurricane prep gone wrong [Ep. 164]sept 2026

De Sailing Supernova — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema