Sailing Supernovavídeo
BOAT JOBS GONE WRONG... [Ep. 26]
26 de janeiro de 2024 · 40 min · 15K visualizações
O que este vídeo aborda
The crew of Supernova performs several maintenance tasks while anchored, including re-rigging the in-mast furling mainsail, installing an anchor bridle, and attempting to replace a throttle cable. To address a binding mainsail car, they re-rig the outhaul using a new knot and add grease to the track, though the car continues to jump.3:15 They install an anchor bridle using an old shackle to relieve tension on the windlass and reduce noise in rolly anchorages.6:19 A two-day effort to replace a faulty throttle cable with a universal Amazon-sourced spare fails because the cable is too long and creates too much friction when looped; the crew decides to order a high-quality, correctly sized replacement.36:00 Additionally, they install a new hose clamp on the washing machine drain line to prevent potential saltwater backflow.25:34 Despite these persistent mechanical challenges, the crew balances the work with beach walks and swimming.38:23 Using high-quality, correctly sized control cables is essential, as cheap, oversized universal replacements create excessive friction that prevents proper shifting.36:35
Mais de Sailing Supernova
De Sailing Supernova — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



