Sailing SV Delosvídeo

Prepping one of our BIGGEST Projects Yet 🛠️ (Aluminum Catamaran Build Pt. 47)

28 de noviembre de 2025 · 34 min · 227K visitas

Qué cubre este vídeo

The crew of the aluminum catamaran Delos 2.0 prepares the vessel’s interior for professional spray-foam insulation.0:17 The process requires completing all structural welding, installing AC and DC electrical conduits, and finalizing plumbing runs through bulkheads.1:00 To prevent corrosion, the team cleans the aluminum surfaces with aircraft-grade Simple Green and applies a protective coating of Nyalic, which beads water and seals the metal from oxygen.10:15 In areas where spray foam is impractical, such as around steering linkages and service runs, the crew installs 25-mil closed-cell foam sheets to maintain access for future maintenance.2:40 The team uses a wet-dry vacuum and blowers to ensure the bilge and hull surfaces are completely dry before applying the Nyalic.15:05 The project requires approximately 4.2 quarts of Nyalic to cover 1,345 square feet of interior surface area.22:58 Proper surface preparation and sealing are essential to prevent oxidation and ensure the spray foam adheres correctly to the aluminum hull.

Ver en YouTube

Más de Sailing SV Delos

Years of Work...One Flip of a Switch 🤯 Aluminum Catamaran Build Pt. 81ago 2026Rethinking Our Propulsion System 🤔 Aluminum Catamaran Build Pt. 80jul 2026The SECRET About Our Roof 🤯 Aluminum Catamaran Build Pt. 79jul 2026The Toilet Episode 💩 Aluminum Catamaran Build Pt. 78jul 2026

De Sailing SV Delos — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema