Sailing SV Delosvideo
Prepping one of our BIGGEST Projects Yet đ ïž (Aluminum Catamaran Build Pt. 47)
28. november 2025 · 34 min · 227K visninger
Hva denne videoen dekker
The crew of the aluminum catamaran Delos 2.0 prepares the vesselâs interior for professional spray-foam insulation.0:17 The process requires completing all structural welding, installing AC and DC electrical conduits, and finalizing plumbing runs through bulkheads.1:00 To prevent corrosion, the team cleans the aluminum surfaces with aircraft-grade Simple Green and applies a protective coating of Nyalic, which beads water and seals the metal from oxygen.10:15 In areas where spray foam is impractical, such as around steering linkages and service runs, the crew installs 25-mil closed-cell foam sheets to maintain access for future maintenance.2:40 The team uses a wet-dry vacuum and blowers to ensure the bilge and hull surfaces are completely dry before applying the Nyalic.15:05 The project requires approximately 4.2 quarts of Nyalic to cover 1,345 square feet of interior surface area.22:58 Proper surface preparation and sealing are essential to prevent oxidation and ensure the spray foam adheres correctly to the aluminum hull.
Mer fra Sailing SV Delos
Fra Sailing SV Delos â se kanalens bĂ„t, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Ăn e-post med flĂ„tens beste funn â Ăžyeblikkene, bĂ„tene og historiene som er verdt din seertid. Skriv inn din egen adresse for Ă„ fĂ„ din egen kopi.



