Sailing Blue Pearlvídeo
Ep 80 | DIY at the docs!
11 de agosto de 2024 · 17 min · 2K visitas
Qué cubre este vídeo
Maintenance projects on the 40-foot Blue Pearl include varnishing exterior teak, resealing leaking windows, and replacing rusted air conditioning squirrel cage fans.0:36 The crew installed a new plumbing valve system in the forward head to allow direct overboard discharge of waste when more than three miles offshore, bypassing the 13-gallon holding tank.7:41 Refrigeration repairs involved tightening loose fittings and replacing a plastic refrigerant cap with a metal one, followed by a system recharge using a gauge set.5:14 Dinghy upgrades include scraping and painting the bottom, adding stabilizer fins to improve planing, and sewing new white vinyl cushions and a helm cover using Sunbrella-like fabric from Sailrite.6:40 Additional work includes installing a cockpit roof overhang to prevent rain ingress, replacing main sail sliders and cars with 12 units from Crusader Sails, and installing new light lens covers from IrwinYachts.com.16:04 The crew also modified cabinetry to accommodate a new washing machine by installing a hinged access panel.13:04
Más de Sailing Blue Pearl
De Sailing Blue Pearl — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



