Sailing Blue Pearlvidéo

Ep 80 | DIY at the docs!

11 août 2024 · 17 min · 2K vues

Ce que couvre cette vidéo

Maintenance projects on the 40-foot Blue Pearl include varnishing exterior teak, resealing leaking windows, and replacing rusted air conditioning squirrel cage fans.0:36 The crew installed a new plumbing valve system in the forward head to allow direct overboard discharge of waste when more than three miles offshore, bypassing the 13-gallon holding tank.7:41 Refrigeration repairs involved tightening loose fittings and replacing a plastic refrigerant cap with a metal one, followed by a system recharge using a gauge set.5:14 Dinghy upgrades include scraping and painting the bottom, adding stabilizer fins to improve planing, and sewing new white vinyl cushions and a helm cover using Sunbrella-like fabric from Sailrite.6:40 Additional work includes installing a cockpit roof overhang to prevent rain ingress, replacing main sail sliders and cars with 12 units from Crusader Sails, and installing new light lens covers from IrwinYachts.com.16:04 The crew also modified cabinetry to accommodate a new washing machine by installing a hinged access panel.13:04

Regarder sur YouTube

Plus de vidéos de Sailing Blue Pearl

Our Precious Daisy Mae💔juin 2026Ep 100 | The Grand Finalejuin 2025Ep 99 | A great adventure!mai 2025Ep 98 | Our big newsmai 2025

De Sailing Blue Pearl — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème