sailing.directory
CanalesBarcosPreguntaSobre el proyecto
🇪🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sesión
sailing.directory

Un índice de los canales de vela de YouTube — con búsqueda por tema y navegación por interés. Nuevos canales y barcos, indexados cada semana. Sin ruido.

Explorar

CanalesBarcosBuscarSobre el proyectoSugerir un canal

Creadores y legal

ApóyanosPara creadoresPrivacidadCondicionesDMCA

No es asesoramiento de navegación · © 2026

InicioCanalesBarcos

Más

BuscarPreguntaSobre el proyectoApóyanosPara creadoresIniciar sesión

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualización

sailing.directory
CanalesBarcosPreguntaSobre el proyecto
🇪🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sesión

Masha B. Mishushat · vídeo

I rebuilt the entire anchor compartment (satisfying transformation)

17 de mayo de 2026 · 25 min · 16K visitas

Woman pulls anchor chain from locker on sunny day

Ver en YouTube

Qué cubre este vídeo

Masha rebuilds the anchor compartment of an 1980s boat that was never originally designed to carry a windlass — a setup added by previous owners that left rotted shelving, a corroded windlass, and ant-infested timber.▶ 1:03 She removes the old chain, cuts out the deteriorated shelves, extracts the main timber with the windlass attached, cleans the locker, lays new fiberglass, and fills and sands with epoxy filler.▶ 1:03 Fitting the replacement shelves proves difficult: the locker geometry prevents inserting them in one piece, requiring cuts and improvised fitting.▶ 5:02 She enlarges the drain hole using a properly sized hole saw after a previous cheap set failed.▶ 2:54 The windlass is cleaned, de-rusted, treated with sealant, and repainted.▶ 16:04 During a test connection, she briefly wires the battery before connecting to the motor terminals — the wrong sequence — and a friend corrects her before damage occurs.▶ 19:40 The windlass tests successfully by hand.▶ 20:59 Paint goes on in two coats.▶ 13:27 The locker is not fully commissioned — a dedicated battery and engine installation remain — but the windlass can be operated manually, satisfying the minimum requirement for launching.▶ 22:58 Rebuilding to the original layout rather than redesigning from scratch saved time at the cost of a perfect solution.▶ 11:05

Más de Masha B. Mishushat

A New Chapter | Life in June While Rebuilding My Boatjun 2026I Didn’t Make It Before the Heatjun 2026Sleeping in a Hammock, Night Watches and Heavy Anchors — A Ship from Another Erajun 2026Can You Build Your Dream Without Knowing How?abr 2026

De Masha B. Mishushat — mira el barco del canal, la tripulación y cada vídeo analizado.

Informar de un problema
InicioCanalesBarcos

Más

BuscarPreguntaSobre el proyectoApóyanosPara creadoresIniciar sesión

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualización

sailing.directory

Un índice de los canales de vela de YouTube — con búsqueda por tema y navegación por interés. Nuevos canales y barcos, indexados cada semana. Sin ruido.

Explorar

CanalesBarcosBuscarSobre el proyectoSugerir un canal

Creadores y legal

ApóyanosPara creadoresPrivacidadCondicionesDMCA

No es asesoramiento de navegación · © 2026