sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão
sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026

InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão

Masha B. Mishushat · vídeo

I rebuilt the entire anchor compartment (satisfying transformation)

17 de maio de 2026 · 25 min · 16K visualizações

Woman pulls anchor chain from locker on sunny day

Ver no YouTube

O que este vídeo aborda

Masha rebuilds the anchor compartment of an 1980s boat that was never originally designed to carry a windlass — a setup added by previous owners that left rotted shelving, a corroded windlass, and ant-infested timber.▶ 1:03 She removes the old chain, cuts out the deteriorated shelves, extracts the main timber with the windlass attached, cleans the locker, lays new fiberglass, and fills and sands with epoxy filler.▶ 1:03 Fitting the replacement shelves proves difficult: the locker geometry prevents inserting them in one piece, requiring cuts and improvised fitting.▶ 5:02 She enlarges the drain hole using a properly sized hole saw after a previous cheap set failed.▶ 2:54 The windlass is cleaned, de-rusted, treated with sealant, and repainted.▶ 16:04 During a test connection, she briefly wires the battery before connecting to the motor terminals — the wrong sequence — and a friend corrects her before damage occurs.▶ 19:40 The windlass tests successfully by hand.▶ 20:59 Paint goes on in two coats.▶ 13:27 The locker is not fully commissioned — a dedicated battery and engine installation remain — but the windlass can be operated manually, satisfying the minimum requirement for launching.▶ 22:58 Rebuilding to the original layout rather than redesigning from scratch saved time at the cost of a perfect solution.▶ 11:05

Mais de Masha B. Mishushat

A New Chapter | Life in June While Rebuilding My Boat06/2026I Didn’t Make It Before the Heat06/2026Sleeping in a Hammock, Night Watches and Heavy Anchors — A Ship from Another Era06/2026Can You Build Your Dream Without Knowing How?04/2026

De Masha B. Mishushat — veja o barco, a tripulação e todos os vídeos analisados do canal.

Reportar um problema
InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026