Sailing Yabávídeo
Getting ready for sailing was going so well until we found a big challenge — Sailing Yabá 215
21 de julio de 2024 · 44 min · 118K visitas
Qué cubre este vídeo
The crew of the vessel Yabá prepares for sea trials by installing deck hardware and reinforcing the mast.0:15 To avoid permanent drilling before finalizing sail geometry, the owner uses Dyneema soft shackles and low-friction rings to mount running rigging on the rails.17:50 This allows for adjustable lead angles for the jib, genoa, and staysail.18:00 The owner reinforces the mast cap with welded rebar to support the backstay, acknowledging that the mast remains stepped throughout the process due to its structural integration with the boat.3:47 Additional cockpit modifications include installing winch supports and a convertible table system using adjustable pistons.8:24 The crew plans to finalize the running rigging lengths by using old lines as references before ordering new sheets.19:04 The project remains weather-dependent, as high winds and rain frequently delay mast-top welding and rigging tasks.8:12 The primary goal is to ensure the standing and running rigging are secure before the first sea trial to avoid structural failure or the need for a haul-out.25:19
Más de Sailing Yabá
De Sailing Yabá — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



