Sailing Yabávideo

Getting ready for sailing was going so well until we found a big challenge — Sailing Yabá 215

21 de julio de 2024 · 44 min · 118K vistas

¿Qué cubre este video?

The crew of the vessel Yabá prepares for sea trials by installing deck hardware and reinforcing the mast.0:15 To avoid permanent drilling before finalizing sail geometry, the owner uses Dyneema soft shackles and low-friction rings to mount running rigging on the rails.17:50 This allows for adjustable lead angles for the jib, genoa, and staysail.18:00 The owner reinforces the mast cap with welded rebar to support the backstay, acknowledging that the mast remains stepped throughout the process due to its structural integration with the boat.3:47 Additional cockpit modifications include installing winch supports and a convertible table system using adjustable pistons.8:24 The crew plans to finalize the running rigging lengths by using old lines as references before ordering new sheets.19:04 The project remains weather-dependent, as high winds and rain frequently delay mast-top welding and rigging tasks.8:12 The primary goal is to ensure the standing and running rigging are secure before the first sea trial to avoid structural failure or the need for a haul-out.25:19

Ver en YouTube

Más de Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáoct 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáoct 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep 2026

De Sailing Yabá — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema