Entre Terras e Maresvideo

This week the focus was on something else

7 de junio de 2026 · 3 min · 100 vistas

¿Qué cubre este video?

Edgar and Sâmia paused work on their boat for two weeks to manage personal administrative tasks and home renovations.Watch During this break, Edgar completed several DIY projects in their apartment to demonstrate that lack of prior expertise does not prevent the successful completion of complex tasks.0:54 He modified a 1.2-meter-tall kitchen cabinet by reconfiguring its doors and drawers.0:50 He also renovated a bathroom, which involved relocating the toilet, installing new porcelain tile, and applying epoxy paint over old tile surfaces.1:38 Additionally, he constructed a drywall partition with integrated lighting, marking his first experience working with the material.2:58 These projects serve as a practical application of his philosophy that acquiring new skills through research and persistence allows for the completion of challenging construction projects, including boat building.3:02

Ver en YouTube

Más de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun 2026WE DID IT! WE FINISHED THE CAPTAIN'S SUITE SINK! S1.ep180may 2026

De Entre Terras e Mares — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema