Entre Terras e Maresvídeo

This week the focus was on something else

7 de junho de 2026 · 3 min · 100 visualizações

O que este vídeo aborda

Edgar and Sâmia paused work on their boat for two weeks to manage personal administrative tasks and home renovations.Watch During this break, Edgar completed several DIY projects in their apartment to demonstrate that lack of prior expertise does not prevent the successful completion of complex tasks.0:54 He modified a 1.2-meter-tall kitchen cabinet by reconfiguring its doors and drawers.0:50 He also renovated a bathroom, which involved relocating the toilet, installing new porcelain tile, and applying epoxy paint over old tile surfaces.1:38 Additionally, he constructed a drywall partition with integrated lighting, marking his first experience working with the material.2:58 These projects serve as a practical application of his philosophy that acquiring new skills through research and persistence allows for the completion of challenging construction projects, including boat building.3:02

Ver no YouTube

Mais de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 18307/2026WE FINISHED the bow cabin LAMINATE ! S1.ep18206/2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 18106/2026WE DID IT! WE FINISHED THE CAPTAIN'S SUITE SINK! S1.ep18005/2026

De Entre Terras e Mares — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema