Sailing Yabávideo
Prepping for the Plunge: Anti-fouling & Boat Transport Starts! — Sailing Yabá 201
7 de abril de 2024 · 34 min · 160K vistas
¿Qué cubre este video?
The crew of Yabá prepares for launch after a three-year refit by applying three coats of blue anti-fouling paint to the hull and positioning the vessel onto a transport crib.11:04 To ensure full coverage, the team lifts the boat using wooden wedges and supports, allowing them to paint areas previously obstructed by jack stands.1:06 Before applying the final coats, the crew installs a grounding plate, requiring a hole to be drilled through the hull and sealed with Sika.1:46 The team also welds new supports for the platform and installs three anodes on each side of the hull.23:29 Additionally, the owner drills a four-inch hole in the transom to accommodate a new exhaust tube, ensuring a downward angle to prevent water ingress.29:19 The superstructure receives a final coat of Alaska white paint.25:08 The boat now sits on the crib, marking the final stage of preparation before returning to the water.33:10
Más de Sailing Yabá
De Sailing Yabá — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



