Sailing Yabávídeo

Prepping for the Plunge: Anti-fouling & Boat Transport Starts! — Sailing Yabá 201

7 de abril de 2024 · 34 min · 160K visualizações

O que este vídeo aborda

The crew of Yabá prepares for launch after a three-year refit by applying three coats of blue anti-fouling paint to the hull and positioning the vessel onto a transport crib.11:04 To ensure full coverage, the team lifts the boat using wooden wedges and supports, allowing them to paint areas previously obstructed by jack stands.1:06 Before applying the final coats, the crew installs a grounding plate, requiring a hole to be drilled through the hull and sealed with Sika.1:46 The team also welds new supports for the platform and installs three anodes on each side of the hull.23:29 Additionally, the owner drills a four-inch hole in the transom to accommodate a new exhaust tube, ensuring a downward angle to prevent water ingress.29:19 The superstructure receives a final coat of Alaska white paint.25:08 The boat now sits on the crib, marking the final stage of preparation before returning to the water.33:10

Assistir no YouTube

Mais de Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabáset. de 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabáset. de 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabáset. de 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáago. de 2026

De Sailing Yabá — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema