sailing.directory
CanalesBarcosPreguntaAcerca de
🇲🇽
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sesión
sailing.directory

Un índice de los canales de vela en YouTube — con búsqueda por tema y navegación por interés. Canales y barcos nuevos, indexados cada semana. Sin ruido.

Explorar

CanalesBarcosBuscarAcerca deSugerir un canal

Creadores y legal

ApóyanosPara creadoresPrivacidadTérminosDMCA

No es asesoramiento de navegación · © 2026

InicioCanalesBarcos

Más

BuscarPreguntaAcerca deApóyanosPara creadoresIniciar sesión

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de pantalla

sailing.directory
CanalesBarcosPreguntaAcerca de
🇲🇽
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sesión

Sailing NV · video

Today We Fit the New Engine: Nanni N4.65 Goes In | S2 Ep 71

21 de septiembre de 2025 · 23 min · 10K vistas

Ver en YouTube

¿Qué cubre este video?

The crew of NV installs a new 60-horsepower Nanni N4.65 diesel engine into their boat, utilizing a yard crane and a custom-rigged pulley system to maneuver the 300-kilogram unit through the companionway.▶ 0:12 To facilitate the lift, the team secures a heavy steel beam to the bimini structure using Spectra rope, creating a load-tested anchor point for a chain block.▶ 1:53 Because the companionway geometry prevents a direct vertical drop, the crew rigs a secondary pulley system at the base of the mast to pull the engine forward during its descent into the saloon.▶ 9:33 They maintain stability by keeping the engine bolted to its shipping pallet during the initial transfer, later using the pallet as a temporary base inside the boat when the chain block reaches its maximum extension.▶ 4:27 Final alignment of the engine shaft to the ZF gearbox requires millimeter-precise adjustments using levers to engage the splines.▶ 17:06 The installation concludes with the engine secured to a custom carbon fiber bed, pending final connections for the exhaust, fuel lines, and control panel.▶ 21:53

Más de Sailing NV

The Adventure Is About To Get Bigger | S3 Ep 15jun 2026We Found Langkawi's Hidden Paradise | S3 Ep 14jun 2026Should We Swap Our Sailboat for One of These? | S3 Ep 13jun 2026Family Sailing Through the Singapore & Malacca Straits | S3 Ep 12may 2026

De Sailing NV — ve el barco, la tripulación y cada video analizado del canal.

Reportar un problema
InicioCanalesBarcos

Más

BuscarPreguntaAcerca deApóyanosPara creadoresIniciar sesión

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de pantalla

sailing.directory

Un índice de los canales de vela en YouTube — con búsqueda por tema y navegación por interés. Canales y barcos nuevos, indexados cada semana. Sin ruido.

Explorar

CanalesBarcosBuscarAcerca deSugerir un canal

Creadores y legal

ApóyanosPara creadoresPrivacidadTérminosDMCA

No es asesoramiento de navegación · © 2026