MJ Sailingvideo
Wooden Door Frames Wouldn't Have Given Us This Much Trouble (MJ Sailing - Ep 345)
5 de octubre de 2024 · 18 min · 31K vistas
¿Qué cubre este video?
Fabricating and installing custom fiberglass door frames for a catamaran interior requires a multi-step process of molding, bonding, and fairing. To create the frames for three head doors, the builders laminated six layers of 1208 fiberglass to achieve a thickness of approximately 3/16 inch.1:05 Rather than constructing complex molds for each unique door opening, they created flat panels, cut them into 1.5-inch strips, and bonded them to the bulkheads using epoxy thickened with colloidal silica.1:50 A one-gallon Total Boat container served as a template to create the radius for the door jams.4:23 The finishing process involves repeated applications of Total Fair epoxy fairing compound, followed by sanding to address pinholes and low spots.8:08 To identify remaining imperfections before applying high-build primer, the builders use a guide coat made of blue Dicom dye mixed with denatured alcohol.11:43 A mini belt sander helps remove excess thickened resin in tight areas, though manual sanding remains necessary for final smoothing.9:46
Más de MJ Sailing
De MJ Sailing — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



