MJ Sailingvidéo

Wooden Door Frames Wouldn't Have Given Us This Much Trouble (MJ Sailing - Ep 345)

5 octobre 2024 · 18 min · 31K vues

Ce que couvre cette vidéo

Fabricating and installing custom fiberglass door frames for a catamaran interior requires a multi-step process of molding, bonding, and fairing. To create the frames for three head doors, the builders laminated six layers of 1208 fiberglass to achieve a thickness of approximately 3/16 inch.1:05 Rather than constructing complex molds for each unique door opening, they created flat panels, cut them into 1.5-inch strips, and bonded them to the bulkheads using epoxy thickened with colloidal silica.1:50 A one-gallon Total Boat container served as a template to create the radius for the door jams.4:23 The finishing process involves repeated applications of Total Fair epoxy fairing compound, followed by sanding to address pinholes and low spots.8:08 To identify remaining imperfections before applying high-build primer, the builders use a guide coat made of blue Dicom dye mixed with denatured alcohol.11:43 A mini belt sander helps remove excess thickened resin in tight areas, though manual sanding remains necessary for final smoothing.9:46

Regarder sur YouTube

Plus de vidéos de MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)août 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)juil. 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)juin 2026Preparing Our Catamaran for Paint—and Me for Captain's Schooljuin 2026

De MJ Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème