Wildling Sailingvideo
This Work is Relentless. But We’re Getting There | Wildling Sailing
13 de octubre de 2023 · 22 min · 121K vistas · Alkmaar
¿Qué cubre este video?
Arthur refits a 42-foot Pahi 42 double canoe, focusing on structural repairs and engine preparation.0:55 He reinforces the chain plate areas with epoxy and filling compound, noting that the original chain plates appeared undersized.1:25 During the sanding process, he discovers a section of bulkhead exhibiting fungal rot, which he plans to excise and seal with epoxy.11:52 He also addresses a leaking deck hatch by removing the unit, filling existing misaligned holes with epoxy, and preparing to redrill for a proper fit.17:23 Arthur’s father assists with the project by constructing engine sleds to support the vessel's propulsion system.19:57 The refit involves extensive use of West System epoxy, fairing compounds, and various power sanding tools.1:58 Arthur prepares the hull for painting while managing the ongoing challenges of plywood repair and moisture-related degradation.
Más de Wildling Sailing
De Wildling Sailing — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



