Wildling Sailingvídeo

This Work is Relentless. But We’re Getting There | Wildling Sailing

13 de octubre de 2023 · 22 min · 121K visitas · Alkmaar

Qué cubre este vídeo

Arthur refits a 42-foot Pahi 42 double canoe, focusing on structural repairs and engine preparation.0:55 He reinforces the chain plate areas with epoxy and filling compound, noting that the original chain plates appeared undersized.1:25 During the sanding process, he discovers a section of bulkhead exhibiting fungal rot, which he plans to excise and seal with epoxy.11:52 He also addresses a leaking deck hatch by removing the unit, filling existing misaligned holes with epoxy, and preparing to redrill for a proper fit.17:23 Arthur’s father assists with the project by constructing engine sleds to support the vessel's propulsion system.19:57 The refit involves extensive use of West System epoxy, fairing compounds, and various power sanding tools.1:58 Arthur prepares the hull for painting while managing the ongoing challenges of plywood repair and moisture-related degradation.

Ver en YouTube

Más de Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran Refitoct 2026I Lifted Her Out For a Very Important Rebuild.sept 2026One Final Refit Before Crossing The Atlantic.ago 20262 Days Alone at Sea On my Primitive Double-Canoe.ago 2026

De Wildling Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema