Sailing Puffinvideo
Will this End in Disaster ? - Episode 26 - Free Sailboat Refit
21 de noviembre de 2021 · 7 min · 721 vistas
¿Qué cubre este video?
Archie strips the mast of Puffin, removing instrumentation, rigging, and the rolling furling headsail components.4:37 He leaves existing cables and lines inside the mast to serve as messenger lines for pulling new wiring.5:03 After removing the mast, he moves it to a secure position on blocks underneath the boat.5:54 To facilitate further refit work during inclement weather, he plans to construct a protective shelter over the deck.6:06 He intends to remove the rubbing strake to utilize its existing mounting holes for securing the shelter's wooden support posts.6:09 Once the shelter is complete, he will install a diesel heater, routing the exhaust through the cockpit drains.6:26 He has ordered a tarpaulin to cover the vessel and protect the work area.6:42
Barcos en este video
Más de Sailing Puffin
De Sailing Puffin — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



