MJ Sailingvideo

CATAMARAN BUILD - Choosing Our Interior & Exterior Lighting (MJ Sailing - Ep 329)

18 de mayo de 2024 · 17 min · 36K vistas

¿Qué cubre este video?

The owners of a catamaran under construction are installing transom steps and planning an interior and exterior LED lighting system.Watch To mount the steps, Matt removes gel coat from the fiberglass surfaces to ensure a strong bond, applies two-part methacrylate adhesive, and secures the steps with through-bolts.0:32 He backfills the drilled holes with thickened resin to prevent moisture intrusion and structural weakness.13:48

For the lighting system, the couple selected Lumishore CRGBW (color, red, green, blue, white) fixtures after consulting with a representative at the 2023 METS trade show.5:50 The plan includes dimmable downlights, courtesy lights for steps and walkways, and strip lighting under galley counters and the salon settee.7:37 A central control panel at the media station will manage color temperature, brightness, and preset lighting modes for the entire vessel.8:27 The installation requires pre-planning wire runs and control box locations before the interior is closed up.10:44 Proper surface preparation and bonding techniques are essential for structural integrity when mounting fiberglass components to a hull.

Ver en YouTube

Más de MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)ago 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)jul 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)jun 2026Preparing Our Catamaran for Paint—and Me for Captain's Schooljun 2026

De MJ Sailing — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema