MJ Sailingvidéo

CATAMARAN BUILD - Choosing Our Interior & Exterior Lighting (MJ Sailing - Ep 329)

18 mai 2024 · 17 min · 36K vues

Ce que couvre cette vidéo

The owners of a catamaran under construction are installing transom steps and planning an interior and exterior LED lighting system.Watch To mount the steps, Matt removes gel coat from the fiberglass surfaces to ensure a strong bond, applies two-part methacrylate adhesive, and secures the steps with through-bolts.0:32 He backfills the drilled holes with thickened resin to prevent moisture intrusion and structural weakness.13:48

For the lighting system, the couple selected Lumishore CRGBW (color, red, green, blue, white) fixtures after consulting with a representative at the 2023 METS trade show.5:50 The plan includes dimmable downlights, courtesy lights for steps and walkways, and strip lighting under galley counters and the salon settee.7:37 A central control panel at the media station will manage color temperature, brightness, and preset lighting modes for the entire vessel.8:27 The installation requires pre-planning wire runs and control box locations before the interior is closed up.10:44 Proper surface preparation and bonding techniques are essential for structural integrity when mounting fiberglass components to a hull.

Regarder sur YouTube

Plus de vidéos de MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)août 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)juil. 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)juin 2026Preparing Our Catamaran for Paint—and Me for Captain's Schooljuin 2026

De MJ Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème