Jakob Lang Sailingvideo
THE FINAL Step Of The Refit (and visiting a boat show)
11 de abril de 2024 · 13 min · 9K vistas · Netherlands
¿Qué cubre este video?
Jakob Lang completes a series of refit projects on his boat, Wolf, while it is in dry dock in the Netherlands.0:11 The primary tasks include installing a custom stern-mounted life raft cage, replacing interior hull insulation, and collecting a repaired spray hood from a local sailmaker.1:34 The life raft installation requires drilling into the hull and railing to accommodate the 40-kilogram canister, which was previously stored in the aft cabin.1:43 The insulation project involves stripping old cork-based hull liners, scraping away residual glue, and measuring, cutting, and bonding new insulation panels throughout the interior.7:01 Between work sessions, Lang visits the boat show in Tulln, Austria, to inspect new models, including the Beneteau Oceanis 350 and the Sunbeam 29.1.4:40 The refit concludes with the installation of the new hull covers on both the port and starboard sides.10:17 Careful measurement and iterative trimming are essential for achieving a precise fit for the new interior insulation panels.8:26
Barcos en este video
Más de Jakob Lang Sailing
De Jakob Lang Sailing — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



