Jakob Lang Sailingvideo

THE FINAL Step Of The Refit (and visiting a boat show)

April 11, 2024 · 13 min · 9K views · Netherlands

What this video covers

Jakob Lang completes a series of refit projects on his boat, Wolf, while it is in dry dock in the Netherlands.0:11 The primary tasks include installing a custom stern-mounted life raft cage, replacing interior hull insulation, and collecting a repaired spray hood from a local sailmaker.1:34 The life raft installation requires drilling into the hull and railing to accommodate the 40-kilogram canister, which was previously stored in the aft cabin.1:43 The insulation project involves stripping old cork-based hull liners, scraping away residual glue, and measuring, cutting, and bonding new insulation panels throughout the interior.7:01 Between work sessions, Lang visits the boat show in Tulln, Austria, to inspect new models, including the Beneteau Oceanis 350 and the Sunbeam 29.1.4:40 The refit concludes with the installation of the new hull covers on both the port and starboard sides.10:17 Careful measurement and iterative trimming are essential for achieving a precise fit for the new interior insulation panels.8:26

Watch on YouTube

Boats in this video

Beneteau Idylle 1350TouredSunbeam 29.1Toured

More from Jakob Lang Sailing

Can I Fix This Alone At Sea? (Cape Verde) | Ep. 18Oct 202619 Year Old Crossing The Atlantic Alone | Ep. 17Sep 2026Attempting Spains Highest Mountain - Atlantic Crossing Ahead | Ep. 16Aug 2026Is This The End? - The Brutal Reality of Sailing Solo Around The WorldJul 2026

From Jakob Lang Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue