PAT | FRANKIEvideo

This Structural Repair Determines Our Future! (Lamination Complete) | BOAT DAMAGE DISASTER Part 9

5 de enero de 2025 · 9 min · 18K vistas

¿Qué cubre este video?

Structural repairs to the hull-to-frame bond involve addressing cracks in the adhesive layer between the sandwich composite hull and the hollow frames.1:02 Rather than removing the frames, which risked misalignment, a professional team restored structural integrity by injecting epoxy into test holes to fill internal voids.4:18 Technicians prepared the surface by removing gel coat along a 10 cm wide section on both sides of the frames and rounding the flange edges to a 45-degree angle to eliminate stress points.3:10 The reinforcement process utilized vacuum-assisted lamination, applying fiberglass mats saturated with epoxy resin to achieve a minimum thickness of 1 cm.5:22 A vacuum foil and spacer fabric ensured even resin distribution and eliminated air pockets during the curing process.5:46 The repair concluded with the application of a protective gel coat and top coat paint in the bilge.6:50 Additionally, the team rebuilt the keel mounting plate by layering fiberglass and epoxy to ensure a snug fit against the keel plate.7:27

Ver en YouTube

Más de PAT | FRANKIE

12.5 days of REALITY crossing the Atlantic Ocean | Part 3 #sailingjun 2025Atlantic Crossing Part 2 | The Night from Hell + Discovering Cape Verdemay 2025Leaving Everything Behind - The First 900 NM | Atlantic Crossing Part 1abr 2025The ULTIMATE Shakedown Sailfeb 2025

De PAT | FRANKIE — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema