PAT | FRANKIEvideo

This Structural Repair Determines Our Future! (Lamination Complete) | BOAT DAMAGE DISASTER Part 9

January 5, 2025 · 9 min · 18K views

What this video covers

Structural repairs to the hull-to-frame bond involve addressing cracks in the adhesive layer between the sandwich composite hull and the hollow frames.1:02 Rather than removing the frames, which risked misalignment, a professional team restored structural integrity by injecting epoxy into test holes to fill internal voids.4:18 Technicians prepared the surface by removing gel coat along a 10 cm wide section on both sides of the frames and rounding the flange edges to a 45-degree angle to eliminate stress points.3:10 The reinforcement process utilized vacuum-assisted lamination, applying fiberglass mats saturated with epoxy resin to achieve a minimum thickness of 1 cm.5:22 A vacuum foil and spacer fabric ensured even resin distribution and eliminated air pockets during the curing process.5:46 The repair concluded with the application of a protective gel coat and top coat paint in the bilge.6:50 Additionally, the team rebuilt the keel mounting plate by layering fiberglass and epoxy to ensure a snug fit against the keel plate.7:27

Watch on YouTube

More from PAT | FRANKIE

12.5 days of REALITY crossing the Atlantic Ocean | Part 3 #sailingJun 2025Atlantic Crossing Part 2 | The Night from Hell + Discovering Cape VerdeMay 2025Leaving Everything Behind - The First 900 NM | Atlantic Crossing Part 1Apr 2025The ULTIMATE Shakedown SailFeb 2025

From PAT | FRANKIE — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue