Acorn To Arabellavideo
Mast Step and Alignment - Episode 152 - Acorn to Arabella: Journey of a Wooden Boat
5 de marzo de 2021 · 25 min · 123K vistas · Spencer, Massachusetts
¿Qué cubre este video?
The crew of the wooden boat *Arabella* fits and shapes a new main mast step, using a plywood pattern to mark and notch the bronze floor timbers.0:52 To prevent structural damage from downward force, the mast step is trimmed to nestle into the hull without wedging against the frames.1:33 After verifying the fit, the team transfers the measurements to the final timber, cutting notches to accommodate the floor timbers.5:26
To ensure the hull has not shifted since the removal of the construction molds, the crew strings a center line from the Samson post and uses a plumb bob to verify alignment at midship, the engine area, and the chain locker.16:36 They also use a string and bubble level across the beam to confirm the boat remains level.17:48 The project moves toward spar fabrication, with plans to repurpose a mast from the vessel *Victoria* for the mizzen and construct a new main mast.22:27 The team also introduces a weekly email newsletter to notify followers of new content and merchandise releases.24:19
Más de Acorn To Arabella
De Acorn To Arabella — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



