Acorn To Arabellavídeo

Mast Step and Alignment - Episode 152 - Acorn to Arabella: Journey of a Wooden Boat

5 de março de 2021 · 25 min · 124K visualizações · Spencer, Massachusetts

O que este vídeo aborda

The crew of the wooden boat *Arabella* fits and shapes a new main mast step, using a plywood pattern to mark and notch the bronze floor timbers.0:52 To prevent structural damage from downward force, the mast step is trimmed to nestle into the hull without wedging against the frames.1:33 After verifying the fit, the team transfers the measurements to the final timber, cutting notches to accommodate the floor timbers.5:26

To ensure the hull has not shifted since the removal of the construction molds, the crew strings a center line from the Samson post and uses a plumb bob to verify alignment at midship, the engine area, and the chain locker.16:36 They also use a string and bubble level across the beam to confirm the boat remains level.17:48 The project moves toward spar fabrication, with plans to repurpose a mast from the vessel *Victoria* for the mizzen and construct a new main mast.22:27 The team also introduces a weekly email newsletter to notify followers of new content and merchandise releases.24:19

Assistir no YouTube

Mais de Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... Againout. de 2026Saying Goodbye to Newfoundland—and the Man Who Inspired Arabellaset. de 2026Upgrading the Rudder and Another Trek To The Cliffago. de 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjul. de 2026

De Acorn To Arabella — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema