Sailing Yabávideo

Installing a restored muffler to the exhaust system of our once wrecked boat — Sailing Yabá 193

11 de febrero de 2024 · 23 min · 95K vistas

¿Qué cubre este video?

Ben and MP continue the restoration of their sailboat, Yabá, by installing a new muffler and constructing a dedicated engine room floor.11:40 To ensure proper exhaust flow, they mount the muffler at a height that allows the outlet to point directly toward the transom, using Purple Heart planks to build a sturdy, level support structure over the existing hull frames.10:48 The installation involves securing the muffler with stainless steel hose clamps and connecting it to the engine’s exhaust hose.19:13 While waiting for the muffler’s fairing compound to cure, the crew also prepares the cat head for future whisker stay installation and adds mooring cleats to the bow.2:54 The project remains dependent on external fabrication for the stainless steel through-hull fitting on the transom and the black water tank.7:59 The crew transitions from daily updates to a weekly posting schedule to focus their energy on completing the remaining tasks required for launch.0:29

Ver en YouTube

Más de Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabásep 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáago 2026

De Sailing Yabá — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema