Sailing Yabávideo

Installing a restored muffler to the exhaust system of our once wrecked boat — Sailing Yabá 193

11 febbraio 2024 · 23 min · 95K visualizzazioni

Cosa tratta questo video

Ben and MP continue the restoration of their sailboat, Yabá, by installing a new muffler and constructing a dedicated engine room floor.11:40 To ensure proper exhaust flow, they mount the muffler at a height that allows the outlet to point directly toward the transom, using Purple Heart planks to build a sturdy, level support structure over the existing hull frames.10:48 The installation involves securing the muffler with stainless steel hose clamps and connecting it to the engine’s exhaust hose.19:13 While waiting for the muffler’s fairing compound to cure, the crew also prepares the cat head for future whisker stay installation and adds mooring cleats to the bow.2:54 The project remains dependent on external fabrication for the stainless steel through-hull fitting on the transom and the black water tank.7:59 The crew transitions from daily updates to a weekly posting schedule to focus their energy on completing the remaining tasks required for launch.0:29

Guarda su YouTube

Altro da Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabáset 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabáset 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabáset 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáago 2026

Da Sailing Yabá — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema